More pictures from the haul out and delivery.
Preparing to remove the mizzen mast:
Removing the upper rigging that connects the main and mizzen tops:
Installing the lift sling:
Thar she goes:
“Hey, can you take this?”:
After the mizzen mast was down and loaded we moved on to the main mast:
Once the main mast was down we had to remove the spreaders and secure the rigging:
Lifting the mast onto the truck:
After everything was secured, the boat was delivered to her summer resting spot. We will update with the delivery pictures soon! Thanks to everyone for all the help!!!!