browser icon
You are using an insecure version of your web browser. Please update your browser!
Using an outdated browser makes your computer unsafe. For a safer, faster, more enjoyable user experience, please update your browser today or try a newer browser.

Update

Posted by on July 28, 2011

We’ve been pretty busy as usual. Tanya has been hard at work cleaning and sanding all the interior wood trim. The previous owners preferred to oil the teak and after decades of oiling it felt pretty sticky and messy. She is doing a great job, the wood looks better than we ever expected! We have also been digging into the electrical. We have pulled yards of wire and other electrical items off the boat. The wiring is really coming along nicely. Bob has been working on the generator installation and today it finally came together! Before the generator went in we positioned the muffler and water heater, replaced the old seacock, and removed/cleaned up the wiring in the locker. We also got around to building our fresh water manifold that will allow us to select and direct where our fresh water comes from and goes to.

Cleaned and sanded waiting to be varnished:

Electrical before:

Electrical after:

Generator pan:

Port locker, water heater in place:

New seacock:

Starting the generator install:

After so much work, generator is sitting in the pan:

Perfect!

A very productive day!!

Comments are closed.