Boat
Delivery Continued
Once the boat was in place we set up the stands that she will rest on for the summer. We can not thank everyone enough for all the help! THANK YOU! Once there are two stands under the stern and one under the bow, he drives the truck out from under the boat. Then we position … Continue reading
Delivery
Once the boat was secured to the trailer it was delivered to Tanya’s father’s house for the summer. Backing out from the water front: Hard left turn into the driveway: Right up to the door: Then back down into her spot for the summer: More later!
Haul Out cont.
More pictures from the haul out and delivery. Preparing to remove the mizzen mast: Removing the upper rigging that connects the main and mizzen tops: Installing the lift sling: Thar she goes: “Hey, can you take this?”: After the mizzen mast was down and loaded we moved on to the main mast: Once … Continue reading
What’s going on?
It’s been a few days and a couple of people (two of the four that read this site) have been asking: what is going on? Well before we are able to set out on our open ended cruise, we have to make a few changes to the boat. In order to do what we want … Continue reading
Heading up River
This picture was taken while heading up the Sheepscot River in Maine: